Enhanced Wastewater Evaporation for Municipal Facilities

The EcoMister Evaporator is the trusted choice for enhanced evaporation in the Wastewater Industry. With over 25 years of experience, the EcoMister Evaporator is a fully automated solution for disposal, requiring minimal maintenance.

With disposal costs starting at 1/10th of a cent per US Gallon (26 cents a Cubic meter), it is an economical alternative to a treatment plant, building additional ponds, or hauling.

The evaporators can be left to run 24/7 throughout your evaporation season with minimal maintenance.

How does EcoMister work for Municipal Wastewater sites?

  • Increases the evaporation process.
  • Cost effective solution for waste water reduction.
  • Scaled to fit season and evaporation rate.

Key features/benefits

  • Minimal maintenance.
  • Automated Wind controls to keep the plume in the containment area.
  • Evaporator stays put throughout the season, can be skid based or trailer based.
  • Can be run on different voltages and from a generator.

Lowest effluent management costs.

Eliminate the need for trucking.

Wind automation controls to manage environmental impacts

Municipal Wastewater

frequently asked questions

Yes. Efficiency may be affected but the evaporators will still work.

Yes, EcoMister Evaporators are used in tropical climates across the world.

This will depend on the water quality of the process water you spray.

At disposal rates starting at 1/10th of a cent per US Gallon or 26 cents per cubic meter, the EcoMister evaporator creates huge cost savings compared to traditional disposal methods.

Most sites will have an evaporation season. We adjust the size and number of evaporators to hit your annual goal within that season.

There are different size units available for your pond size.

You can create a lined evaporation area if you have no pond.

With wind controls, the EcoMister Evaporator ensures all the plume remains in the defined evaporation area.

case studies

case studies

Everything That Comes Here, Stays Here

Crowsnest/Pincher Creek Landfill

Everything That Comes Here, Stays Here

The Proof is in the Pond

Mascot/Nickleplate Mine, Hedley BC, Canada.

The Proof is in the Pond